The hydraulic barrier for an industrial site in Falconara was significantly underperforming, achieving only 12m3/hr with a drawdown of 8m. A downhole video inspection revealed…
Category: BoreSaver Ultra C Case Studies
The public water supply borehole for Fair Isle was contaminated with manganese and iron deposits which had choked the pump, screen and possibly the rock…
Geoquip were called out to Aintree Race Course following problems with the borehole pump and a falling yield which meant all three pumps couldn’t be…
Client: Water Services, NI Location: Belfast N Ireland Product: BoreSaver Ultra C Project Description: The remediation of a well that had been abandoned…
Heat Exchangers servicing the EDF Building at Le Defence were found to be clogged with the iron oxide residues, affecting the water flow rate and…